Stone retaining wall repair recommendations

Business

Ledgestone retaining wall building tips: If the block Retaining wall is more substantial as in a metre high or more then the fence would have to be behind the wall instead of through or on top. Most Segmental Retaining Wall blocks do not have a big enough cavity or void for the fence post to be directly concreted inside them and would lack the strength to hold the weight of a fence. Generally, most walls are built using an aggregate (Gravel) backfill or in some circumstances No Fines Concrete (NFC). Because of this, an allowance has to be made for the fence post at the early construction stage such as installing PVC Piping as a sleave for the fence post to fit into, this would require some forethought and good planning.

These pros like soapstone because the lines created by grease pencils and markers can stay visible for a long time, whereas soapstone washes off in the rain. The downside is that soapstone doesn’t work as well on wet blocks. You can find these pencils at online retailers. Stagger the overlaps (at least 4 inches for this Versa-Lok product) and try to keep the butt joint between the blocks as tight as possible. Large gaps can create a pathway for water and sediment. Whichever type of block you use, make sure you follow the manufacturer’s instructions.

DON’T lay blocks on an unlevel surface. The first course (or row of blocks) sets the stage for the rest of the wall, so it’s vital that you make it perfectly level. If it isn’t, subsequent rows won’t be level either, resulting in a retaining wall that’s lopsided and unattractive. Use a four-foot carpenter’s level to ensure that the gravel layer below the first course of blocks is level before you start setting the blocks. Any discrepancies here will show up higher in the wall. DO stack blocks at a slight backward slope.

Spacers are set to maintain spacing and support the form prior to the pour. Wire ties snug the form and resist the pressure of the wet concrete. Wales align the form and brace the studs in forms more than 4 or 5 feet high. Two horizontal walls are sufficient for most forms, but they should not be spaced greater than 30 inches on center. For lower, lighter walls, it is possible to cast the wall at the same time you cast the footer. Larger walls always require separate pours for the footer and wall. Find even more information at Building and repair of retaining walls Colorado.

We serve all of Colorado out of our home office in Colorado Springs. Please feel free to reach out to us with any questions you may have. Estimates are always free and everything we touch comes with a warranty. Colorado Retaining Wall specializes in the building and repair of retaining walls. Whether the wall is for a backyard or driveway of a residence or a commercial Shopping Center, we design and build large block walls for all Earth retention requirements. We have the ability to fortify the wall with shotcrete or soil nails which would include helical tie-backs or micropiles. Nearly every wall we build requires engineering and we have deep relationships with engineers that work hand-in-hand with our foremen regardless of the size of project. Please read our reviews and look and our photo gallery.